Skip to Main Content
Skip to left navigation

Citrus County

Cambridge Greens Sewer Connection Program
Opens Aug 1 2025 12:00 AM (EDT)
Deadline Jul 30 2026 05:00 PM (EDT)
Description

Per the Florida Springs and Aquifer Protection Act (2016), the Basin Management Action Plan (BMAP), and Florida Statue 403.067 (7), and in response to the 2021 Water Feasibility Study, Citrus County (the County) initiated the Sewer Connection Incentive Program (Sewer Connection Program) to assist Citrus County citizens with grant funding. The Sewer Connection Program begins on July 31, 2025 at 8:00 a.m. and ends on July 30, 2026 at 5 p.m. The Sewer Connection Program is subject to funding availability with a State grant from the Florida Department of Environmental Protection (FDEP). The Sewer Connection Program grants are strictly limited to only eligible targeted areas pre-approved by FDEP. 



Sewer Connection Program

The Sewer Connection Program provides a reimbursement of up to $4,000.00 per existing home to eligible Homeowners in the Cambridge Greens Subdivision, to assist with costs incurred to switch from an existing septic system and connect to central sewer.

The Homeowner agrees to pay any additional costs above the Sewer Connection Program’s $4,000.00 grant award and any ineligible grant expenses. All completed work must follow all applicable County codes and Florida Health Department requirements.


Permits must be applied for and approved prior to start of site work.

The following fees are ineligible for grant reimbursement, therefore the Homeowner is responsible for the following charges (amounts listed are current as of October 1, 2024, and subject to change at any time):

  • Citrus County Utility Wastewater Plant Capacity Charge $1,156.29
  • Citrus County Utility Wastewater Off-site Facilities Charge $1,677.65
  • Citrus County Building Department inspection fee of approximately $50.00
  • Citrus County Right-of Way Permit of approximately $30.00
  • Citrus County Wastewater deposit of $140.00
  • Citrus County Wastewater Inspection fee of $100.00
  • Citrus County Utility account activation fee of $50.00

Once the Homeowner's registered septic installer or licensed plumber completes the work to connect to the central sewer system and all inspections are complete, the Homeowner will remit all eligible paid receipts and proof of payment for reimbursement review. The proof of payment must be a cleared bank check, credit/debit card receipt, or copy of a cashier’s check (cash payments are not grant reimbursable).

Upon review and approval of the site work and receipts,  grant funding of up to $4,000.00 is available to the Homeowner for eligible sewer connection costs which include demolition of old septic tank, plumbing work from the house to the County right-of-way, and connection of the on-sight plumbing to the County’s wastewater collection infrastructure. Receipts must be provided from a registered septic installer or licensed plumber.

All sitework and inspections must be scheduled by July 30, 2026.

Applicant Process Criteria

  1. The Water Resources Department will mail the Sewer Connection Grant Pre-Application to an eligible grant applicant FDEP approved address. The Grant Pre-Application must be submitted for each eligible home. This will be done utilizing a link posted to the Citrus County Water Resources Department webpage through SurveyMonkey (https://citrusbocc.smapply.io/prog/sewer_connection_incentive_program/ or searching by the shortened URL www.citrusbocc.com/sewerconnection) or by mail or in-person drop off to:
    Citrus County Department of Water Resources
    3600 W Sovereign Path
    Lecanto, FL 34461
  2. The pre-application will be assigned a grant number for tracking purposes. If the grant application form is incomplete, the Water Resources Department will contact the applicant by the preferred method chosen by the applicant on the grant pre-application.
  3. The Water Resources Department will notify the Homeowner of the eligibility determination. If eligibility is approved, the Water Resources Department remits a Grant Reimbursement Checklist to the Homeowner by the preferred method chosen by the applicant. Please retain this checklist as it will contain your application number and will be needed for reimbursement. The eligibility approval will hold your funding but does not guarantee payment until all requirements are met. If eligibility is denied, the Water Resources Department will notify the Homeowner of the determination.
  4. The Homeowner selects the registered septic installer or the licensed plumber to obtain the plumbing permits to complete the sewer connection work. The grant will cover up to $4,000.00 grant eligible plumbing costs. The grant eligible costs to connect to the central sewer include the demolition of the septic tank, plumbing work from the house to the County right-of-way, and connection of the on-site plumbing to the County’s wastewater collection infrastructure. The Homeowner will be responsible for any additional costs or grant ineligible costs.
  5. The Homeowner is responsible for the following fees (amounts listed are current as of October 1, 2024 and subject to change at any time):
    • Citrus County Utility Wastewater Plant Capacity Charge $1,156.29
    •  Citrus County Utility Wastewater Off-site Facilities Charge $1,677.65
    • Citrus County Building Department inspection fee of approximately $50.00
    • Citrus County Right-of Way Permit of approximately $30.00
    • Citrus County Wastewater deposit of $140.00
    • Citrus County Wastewater Inspection fee of $100.00 
    • Citrus County Utility account activation fee of $50.00
      Due to the service types, these are ineligible grant expenses.
  6. Once fully completed, inspected, and approved by the Citrus County Department of Water Resources and the Florida Health Department, the Homeowner will remit the Sewer Connection Program’s Grant Reimbursement Packet to the Water Resources Department. This will be done by mail or in-person drop off to:
    Citrus County Water Resources Department
    3600 W Sovereign Path
    Lecanto, FL 34461
  7. The Water Resources Department will review the Packet and forward to the Grants Division for final approval.
  8. The Grants Division will review and award up to $4,000 grant award for eligible cost. A grant reimbursement of up to $4,000.00 for eligible  sewer connection costs based on the eligible paid receipts of the registered septic installer or licensed plumber to the Homeowner.

Eligible grant awards are on an approved pre -application basis. Please submit applications in their entirety. The County may determine that further information is necessary to process a grant request and contact the applicant by email and/or mail according to the Homeowners preference, for additional documentation. It is the applicant’s responsibility to provide this information as requested. The County does not consider incomplete applications. 

Ineligible Grant Applicants and Costs

  • A Homeowner with unpaid County code enforcement license, fees, or property taxes.
  • A Homeowner with the adjudication of guilt withheld for a crime which is a felony or financial mismanagement within the last two years.
  • A Homeowner with a residence not in an approved FDEP Area.
  • Non-residential parcels.
  • Sitework and inspections not scheduled by July 30, 2026.



Apply

Cambridge Greens Sewer Connection Program


Per the Florida Springs and Aquifer Protection Act (2016), the Basin Management Action Plan (BMAP), and Florida Statue 403.067 (7), and in response to the 2021 Water Feasibility Study, Citrus County (the County) initiated the Sewer Connection Incentive Program (Sewer Connection Program) to assist Citrus County citizens with grant funding. The Sewer Connection Program begins on July 31, 2025 at 8:00 a.m. and ends on July 30, 2026 at 5 p.m. The Sewer Connection Program is subject to funding availability with a State grant from the Florida Department of Environmental Protection (FDEP). The Sewer Connection Program grants are strictly limited to only eligible targeted areas pre-approved by FDEP. 



Sewer Connection Program

The Sewer Connection Program provides a reimbursement of up to $4,000.00 per existing home to eligible Homeowners in the Cambridge Greens Subdivision, to assist with costs incurred to switch from an existing septic system and connect to central sewer.

The Homeowner agrees to pay any additional costs above the Sewer Connection Program’s $4,000.00 grant award and any ineligible grant expenses. All completed work must follow all applicable County codes and Florida Health Department requirements.


Permits must be applied for and approved prior to start of site work.

The following fees are ineligible for grant reimbursement, therefore the Homeowner is responsible for the following charges (amounts listed are current as of October 1, 2024, and subject to change at any time):

  • Citrus County Utility Wastewater Plant Capacity Charge $1,156.29
  • Citrus County Utility Wastewater Off-site Facilities Charge $1,677.65
  • Citrus County Building Department inspection fee of approximately $50.00
  • Citrus County Right-of Way Permit of approximately $30.00
  • Citrus County Wastewater deposit of $140.00
  • Citrus County Wastewater Inspection fee of $100.00
  • Citrus County Utility account activation fee of $50.00

Once the Homeowner's registered septic installer or licensed plumber completes the work to connect to the central sewer system and all inspections are complete, the Homeowner will remit all eligible paid receipts and proof of payment for reimbursement review. The proof of payment must be a cleared bank check, credit/debit card receipt, or copy of a cashier’s check (cash payments are not grant reimbursable).

Upon review and approval of the site work and receipts,  grant funding of up to $4,000.00 is available to the Homeowner for eligible sewer connection costs which include demolition of old septic tank, plumbing work from the house to the County right-of-way, and connection of the on-sight plumbing to the County’s wastewater collection infrastructure. Receipts must be provided from a registered septic installer or licensed plumber.

All sitework and inspections must be scheduled by July 30, 2026.

Applicant Process Criteria

  1. The Water Resources Department will mail the Sewer Connection Grant Pre-Application to an eligible grant applicant FDEP approved address. The Grant Pre-Application must be submitted for each eligible home. This will be done utilizing a link posted to the Citrus County Water Resources Department webpage through SurveyMonkey (https://citrusbocc.smapply.io/prog/sewer_connection_incentive_program/ or searching by the shortened URL www.citrusbocc.com/sewerconnection) or by mail or in-person drop off to:
    Citrus County Department of Water Resources
    3600 W Sovereign Path
    Lecanto, FL 34461
  2. The pre-application will be assigned a grant number for tracking purposes. If the grant application form is incomplete, the Water Resources Department will contact the applicant by the preferred method chosen by the applicant on the grant pre-application.
  3. The Water Resources Department will notify the Homeowner of the eligibility determination. If eligibility is approved, the Water Resources Department remits a Grant Reimbursement Checklist to the Homeowner by the preferred method chosen by the applicant. Please retain this checklist as it will contain your application number and will be needed for reimbursement. The eligibility approval will hold your funding but does not guarantee payment until all requirements are met. If eligibility is denied, the Water Resources Department will notify the Homeowner of the determination.
  4. The Homeowner selects the registered septic installer or the licensed plumber to obtain the plumbing permits to complete the sewer connection work. The grant will cover up to $4,000.00 grant eligible plumbing costs. The grant eligible costs to connect to the central sewer include the demolition of the septic tank, plumbing work from the house to the County right-of-way, and connection of the on-site plumbing to the County’s wastewater collection infrastructure. The Homeowner will be responsible for any additional costs or grant ineligible costs.
  5. The Homeowner is responsible for the following fees (amounts listed are current as of October 1, 2024 and subject to change at any time):
    • Citrus County Utility Wastewater Plant Capacity Charge $1,156.29
    •  Citrus County Utility Wastewater Off-site Facilities Charge $1,677.65
    • Citrus County Building Department inspection fee of approximately $50.00
    • Citrus County Right-of Way Permit of approximately $30.00
    • Citrus County Wastewater deposit of $140.00
    • Citrus County Wastewater Inspection fee of $100.00 
    • Citrus County Utility account activation fee of $50.00
      Due to the service types, these are ineligible grant expenses.
  6. Once fully completed, inspected, and approved by the Citrus County Department of Water Resources and the Florida Health Department, the Homeowner will remit the Sewer Connection Program’s Grant Reimbursement Packet to the Water Resources Department. This will be done by mail or in-person drop off to:
    Citrus County Water Resources Department
    3600 W Sovereign Path
    Lecanto, FL 34461
  7. The Water Resources Department will review the Packet and forward to the Grants Division for final approval.
  8. The Grants Division will review and award up to $4,000 grant award for eligible cost. A grant reimbursement of up to $4,000.00 for eligible  sewer connection costs based on the eligible paid receipts of the registered septic installer or licensed plumber to the Homeowner.

Eligible grant awards are on an approved pre -application basis. Please submit applications in their entirety. The County may determine that further information is necessary to process a grant request and contact the applicant by email and/or mail according to the Homeowners preference, for additional documentation. It is the applicant’s responsibility to provide this information as requested. The County does not consider incomplete applications. 

Ineligible Grant Applicants and Costs

  • A Homeowner with unpaid County code enforcement license, fees, or property taxes.
  • A Homeowner with the adjudication of guilt withheld for a crime which is a felony or financial mismanagement within the last two years.
  • A Homeowner with a residence not in an approved FDEP Area.
  • Non-residential parcels.
  • Sitework and inspections not scheduled by July 30, 2026.



Apply
Opens
Aug 1 2025 12:00 AM (EDT)
Deadline
Jul 30 2026 05:00 PM (EDT)